Subscribe to Get Free SMS alert for SCDL Assignments

SCDL Assignments Share & Earn Program.

Hello everyone !!.

So hows life going with SCDL ?. Do you think you are getting bored with SCDL Study and SCDL Assignments ?. So want some fun & funds as well ?

Click below to earn money by sharing your SCDL Assignments:-

SCDL Assignments Share & Earn Program.

Showing posts with label Maintenance Management. Show all posts
Showing posts with label Maintenance Management. Show all posts

Monday, July 20, 2009

Maintenance Management - 10 SCDL Assignments

Bookmark and Share
Maintenance Management - 10
SCDL Assignments on Maintenance Management

Question Handling instruction is transportation instructions.
Correct Answer True

Question The supervisor must have good knowledge of his job, he should be able to lead by example.
Correct Answer True

Question Which two departments are closely related to each other?
Correct Answer Production & maintenance

Question Which is considered as main job of a supervisor?
Correct Answer To train subordinate

Question The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room.
Correct Answer Schedule Board

Question On What basis time estimates are calculated for every job while preparing schedules of work in overhauling?
Correct Answer Standard Time

Question The choice of equipment and supplier must be done keeping in mind the ________ in the future.
Correct Answer Maintenance cost

Question Which of the following are the constituents of fire?
Correct Answer Fuel , Heat , Oxygen

Question Following equipment must be tested for correct load bearing capacity :-
Correct Answer Scaffolding , Ladder , Platform

Question Maintenance department evaluation can be done by only one method.
Correct Answer False

Question What is required to bring people together & working in one direction to achieve goals?Correct Answer Team spirit

Question First aid can be given in following accidents :-
Correct Answer Steam burns , Chemical spilling

Question What is necessary to observe safety precautions in plant particularly relating to worker?
Correct Answer Training (safety)

Question High quality of workmanship helps maintenance people :-
Correct Answer For boosting Morale of Maintenance People , In Identification of efficientworkers , Rewarding Efficient Workers

Question Shelves, Closets such fittings are consider as costing centers for buildings in the assets register.
Correct Answer True

Question Which type of task is a preparation of policy of procurement?
Correct Answer Single contract task

Question Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer Trigger

Question Which of the following are diagnostics instrument which are used in maintenance management?
Correct Answer Time Tester , Safety checker for portable electrical tools , TemperatureSensitive Crayons

Question The efforts are made to reduce time/effort required in carrying outmaintenance work is ________.
Correct Answer Design-in-maintenance

Question It is objective of maintenance to make maximum availability of production plant at :-Correct Answer Minimum cost

Question Once the budget is prepared then it is necessary to review the same________.
Correct Answer Time to time

Related Searches:
SCDL Assignments,SCDL Papers,SCDL Paper,SCDL Assignment,SCDL Solved papers,SCDL Solved assignments,SCDL 2009,SCDL Solved paper,SCDL Assignment
For SCDL Sample Paper, SCDL Solved Assignments, SCDL Model Papers, SCDL previous year question papers, SCDL Assignment, SCDL Papers, SCDL HR/Finance Papers, SCDL Assignments 2009,SCDL Pune Exam, SCDL Pune Papers.
Bookmark and Share

Tuesday, June 30, 2009

Maintenance Management , SCDL Solved Papers on Maintenance Management

Bookmark and Share
Assignments of Maintenance Management
SCDL Solved Papers on Maintenance Management


Assignments of Maintenance Management - 5

LIST OF ATTEMPTED QUESTIONS AND ANSWERS


Match The Following
Question
Correct Answer
Your Answer
Repair Maintenance Course
Principles of Equipments
Chars & reports
Safety course
Nature of Accidents
Nature of Accidents
Computer training
Terminology
Terminology
Staff Development courses
Hierarchy in the organisation
Hierarchy in the organisation

True/False
Question
In the drawing of machinery both views to be shown.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Value analysis applies ________ approach to find out unnecessary cost.
Correct Answer
Creative
Your Answer
Knowledge base

Multiple Choice Multiple Answer
Question
Development of subordinates broadly will depend on :-
Correct Answer
The level of education , The level of personal skill , The level of intelligence
Your Answer
The level of education , The level of personal skill , The level of intelligence

Select The Blank
Question
Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer
Trigger
Your Answer
Trigger

True/False
Question
Electrical energy is the most commonly used form of energy.
Correct Answer
True
Your Answer
True

Select The Blank
Question
The maintenance earns profit by________.
Correct Answer
Zero Faults
Your Answer
Zero Faults

Select The Blank
Question
There are ________ chemicals which are in common use.
Correct Answer
60000
Your Answer
60000

Select The Blank
Question
In ________ phase the plant is observed for any indications of defects.
Correct Answer
Post overhaul
Your Answer
Post overhaul

Multiple Choice Multiple Answer
Question
In Maintenance Control Model following things are very important :-
Correct Answer
Lubrication Schedule , Preventive Maintenance , Inspection Schedule
Your Answer
Lubrication Schedule , Preventive Maintenance , Inspection Schedule

Multiple Choice Single Answer
Question
Overtime working of operator make them less alert mentally & physically, this may cause :-
Correct Answer
Accident
Your Answer
Accident

Select The Blank
Question
A unit called ________ measures illumination.
Correct Answer
Lux
Your Answer
Lux




Assignments of Maintenance Management - 4
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question
Preventive maintenance program reduces overall maintenance cost which also include spare cost.
Correct Answer
True
Your Answer
True

True/False
Question
Textile oil is nothing but automotive lubricative oil.
Correct Answer
False
Your Answer
False

True/False
Question
The time period for budget is taken as one year.
Correct Answer
True
Your Answer
True

True/False
Question
Now a days a trend is emerging of employing multi skilled executives who are trained in many disciplines.
Correct Answer
True
Your Answer
True

True/False
Question
Maintainability is defined as ease with which product can be serviced or repaired.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
Which qualities are required for Maintenance Inspector?
Correct Answer
Sound Judgement ability
Your Answer
Fault system analysis

Match The Following
Question
Correct Answer
Your Answer
Control System
Feedback of Information
Feedback of Information
Work Order Release System
Trigger to start activities
Trigger to start activities
Technical Literature
Relevant Drawings
Relevant Drawings
Progress of Work
Schedule Board
Maintenance Record

Multiple Choice Multiple Answer
Question
The subjective evaluation method characteristics are :-
Correct Answer
Attitude to change , Moral of maintenance staff , Safety consciousness
Your Answer
Objectives of the organization , Attitude to change , Moral of maintenance staff

Select The Blank
Question
Adequate ________ should be provided in the design of the equipment to prevent any mishap.
Correct Answer
Interlocks, safety alarms
Your Answer
Interlocks, safety alarms

Select The Blank
Question
________ is extensively used in testing pressure vessels & steam pipes.
Correct Answer
Leakage Testing
Your Answer
Pressure Testing

Multiple Choice Single Answer
Question
How a molecule of fuel fragmented?
Correct Answer
H+ and OH-
Your Answer
H+ and OH-

Multiple Choice Single Answer
Question
Normally Ratio of Unplanned work to planned work is given in :-
Correct Answer
Maintenance Report & Analysis
Your Answer
Maintenance Report & Analysis

True/False
Question
The steam trap plays a vital role in the performance of the machine.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
Proper spare part will enhance the life of equipment and will save vital :-
Correct Answer
Capital expenditure
Your Answer
Time to restore production

Multiple Choice Multiple Answer
Question
Spare part can be categorized by :-
Correct Answer
The speed of use , Its value , Its availability
Your Answer
Its value , Its availability , Its source of supply

Multiple Choice Multiple Answer
Question
Which are the ways to release work orders?
Correct Answer
Supervisors himself issues it , To display on work order board , To put it in allotted flaps of workers
Your Answer
To display on work order board , To put it in allotted flaps of workers , Let workers ask about it

Match The Following
Question
Correct Answer
Your Answer
Scheduling
Necessary
As per Plan
Down time control
Zero
Required
Inventory level
Low
Low
Preventative maintenance
As per Plan
Necessary

Select The Blank
Question
Maintenance department falls under ________ department.
Correct Answer
Service
Your Answer
Procurement

Select The Blank
Question
Lubrication of machines is done________.
Correct Answer
As per schedule
Your Answer
As per schedule

Multiple Choice Single Answer
Question
Before starting evaluation of maintenance function, it is better to start with :-
Correct Answer
SWOT analysis of maintenance function
Your Answer
SWOT analysis of maintenance function

Multiple Choice Single Answer
Question
The maintenance analysis gives total down time and its percentage with respect to :-
Correct Answer
Total available period
Your Answer
Total available period

Select The Blank
Question
The maintenance earns profit by________.
Correct Answer
Zero Faults
Your Answer
Low Breakdown

Multiple Choice Single Answer
Question
The modern management is composed of evaluation, refinement and integration of functional objectives into an :-
Correct Answer
Integrated corporate goal
Your Answer
Integrated organization goal

Multiple Choice Multiple Answer
Question
The objective inventory control is :-
Correct Answer
To reduce lead time , To reduce finance cost of inventory , To reduce storage cost of material
Your Answer
To reduce finance cost of inventory , To over stock material to avoid shortages , To reduce storage cost of material

Multiple Choice Multiple Answer
Question
The three major cost associated with inventories are :-
Correct Answer
Inventory carrying cost , Ordering cost , Stock out cost
Your Answer
Inventory carrying cost , Ordering cost , Stock out cost

Multiple Choice Multiple Answer
Question
The price structure of purchased equipment generally consist of :-
Correct Answer
The basic price of the machine , The nature of taxes and duties , The price of essential spares for sufficient stock, transport, Insurance etc.
Your Answer
The basic price of the machine , The nature of taxes and duties , The price of essential spares for sufficient stock, transport, Insurance etc.

Select The Blank
Question
In Japan & Western countries equipment discarded after about ________ years.
Correct Answer
7
Your Answer
10

Select The Blank
Question
Moving objects wear out giving rise to ________.
Correct Answer
Debris
Your Answer
Viscosity

Multiple Choice Single Answer
Question
Which of the following is process variable which can affect the equipment?
Correct Answer
Flow rate of process fluid
Your Answer
Flow rate of process fluid

True/False
Question
Value analysis is one way to attempt for quality simplification.
Correct Answer
True
Your Answer
True

Select The Blank
Question
a ________ is the cost of money invested in stocks is usually borrowed from banks as working capital.
Correct Answer
Financing cost
Your Answer
Financing cost

True/False
Question
Defect analysis gives us information about commonly faced problems.
Correct Answer
True
Your Answer
True

Select The Blank
Question
The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room.
Correct Answer
Schedule Board
Your Answer
Job Card

Multiple Choice Multiple Answer
Question
What are the essentials of well planned lubrication system?
Correct Answer
Frequency of lubrication , Quality of lubricant , Quantity of lubricant
Your Answer
Frequency of lubrication , Quality of lubricant , Quantity of lubricant

True/False
Question
Technology review is done to check the performance efficiency of plant.
Correct Answer
True
Your Answer
True

Select The Blank
Question
The manufacturing time for spare parts can vary from________.
Correct Answer
Zero to one year
Your Answer
Zero to one year

Multiple Choice Single Answer
Question
Freight & packing/forwarding brought down to 1% from 5% is example of :-
Correct Answer
Cost reduction
Your Answer
Cost reduction

Multiple Choice Multiple Answer
Question
The following costs can be treated under the heads of Wages and salaries :-
Correct Answer
The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges.
Your Answer
The salaries of foreman, fitters, electricians etc. , Overtime charges. , Contract labor charges.

True/False
Question
Too may cooks spoil the broth.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer
Question
Some of the elements of the ordering cost are :-
Correct Answer
Cost of stationary used for purchase function , Depreciation for the furniture, computer & other equipments , Entertainment of vendors.
Your Answer
Cost of stationary used for purchase function , Depreciation for the furniture, computer & other equipments , Entertainment of vendors.

Multiple Choice Single Answer
Question
Which two departments are closely related to each other?
Correct Answer
Production & maintenance
Your Answer
Production & maintenance

Select The Blank
Question
________ is the period that elapses between the recognition of the need of spare parts and its fulfillment.
Correct Answer
Lead time
Your Answer
Lead time

Multiple Choice Single Answer
Question
The responsibility of maintenance Department is to ensure cost at :-
Correct Answer
Minimum
Your Answer
Standard

Multiple Choice Multiple Answer
Question
Master list of all the supplier should consist of information such as :-
Correct Answer
Name, address, telephone, fax nos , Financial status , His rating for the year.
Your Answer
Name, address, telephone, fax nos , Financial status , His rating for the year.

Multiple Choice Multiple Answer
Question
What should be contents of Computer training?
Correct Answer
Computer Terminology , It's use in Maintenance , How to handle it
Your Answer
Computer Terminology , It's use in Maintenance , How to handle it

Multiple Choice Single Answer
Question
What can be minimized by detecting an incipient fault?
Correct Answer
Damage
Your Answer
Accident

Multiple Choice Multiple Answer
Question
Some of the elements of inventory carrying cost are :-
Correct Answer
Storage expenses , Insurance charges , Cost of deterioration
Your Answer
Storage expenses , Insurance charges , Cost of deterioration
Bookmark and Share

Friday, May 29, 2009

SCDL Assignments on Maintenance Management - 5

Bookmark and Share
SCDL Assignments on Maintenance Management - 5
SCDL Solved Papers and Assignments

Below is the list of question for Maintenance Management - 5 SCDL question

LIST OF ATTEMPTED QUESTIONS AND ANSWERS



Match The Following
Question
Correct Answer
Your Answer
Repair Maintenance Course
Principles of Equipments
Chars & reports
Safety course
Nature of Accidents
Nature of Accidents
Computer training
Terminology
Terminology
Staff Development courses
Hierarchy in the organisation
Hierarchy in the organisation

True/False
Question
In the drawing of machinery both views to be shown.
Correct Answer
True
Your Answer
True

Select The Blank
Question
Value analysis applies ________ approach to find out unnecessary cost.
Correct Answer
Creative
Your Answer
Knowledge base

Multiple Choice Multiple Answer
Question
Development of subordinates broadly will depend on :-
Correct Answer
The level of education , The level of personal skill , The level of intelligence
Your Answer
The level of education , The level of personal skill , The level of intelligence

Select The Blank
Question
Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer
Trigger
Your Answer
Trigger

True/False
Question
Electrical energy is the most commonly used form of energy.
Correct Answer
True
Your Answer
True

Select The Blank
Question
The maintenance earns profit by________.
Correct Answer
Zero Faults
Your Answer
Zero Faults

Select The Blank
Question
There are ________ chemicals which are in common use.
Correct Answer
60000
Your Answer
60000

Select The Blank
Question
In ________ phase the plant is observed for any indications of defects.
Correct Answer
Post overhaul
Your Answer
Post overhaul

Multiple Choice Multiple Answer
Question
In Maintenance Control Model following things are very important :-
Correct Answer
Lubrication Schedule , Preventive Maintenance , Inspection Schedule
Your Answer
Lubrication Schedule , Preventive Maintenance , Inspection Schedule

Multiple Choice Single Answer
Question
Overtime working of operator make them less alert mentally & physically, this may cause :-
Correct Answer
Accident
Your Answer
Accident

Select The Blank
Question
A unit called ________ measures illumination.
Correct Answer
Lux
Your Answer
Lux

Related Searches:
SCDL 2009,SCDL Papers 2009,SCDL Assignments,SCDL Sample Assignments,SCDL Sample Papers,SCDL Solved Assignments,SCDL Papers lists,SCDL Guide,SCDL Pune Papers,SCDL Symbiosys Papers,SCDL Pune Assignments,Assignments on SCDL,SCDL course papers,Assignments 2009 on SCDL.
Bookmark and Share

Tuesday, March 31, 2009

SCDL Solved Papaers on Maintenance Management - 1

Bookmark and Share
Maintenance Management - 1 Solved Question of SCDL

LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Question Which of the following of the main qualities of lubricant?
Answer Viscosity , Antiwear property , Alkalinity
Your Answer
Alkalinity , Viscosity , Antiwear property

Select The Blank
Question
________ & maintenance department are closely interlinked to each other.
Correct Answer
Production
Your Answer
Production

Select The Blank
Question
Quality should not be ________ at the cost of lower price.
Correct Answer
Sacrificed
Your Answer
Sacrificed

Multiple Choice Multiple Answer
Question
In the objective evaluation method, the performance indicators are :-
Correct Answer
Spare part ratio , Overtime ratio , Availability of plant ratio
Your Answer
Working capital ratio , Spare part ratio , Overtime ratio

True/False
Question
Shelves, Closets such fittings are consider as costing centers for buildings in the assets register.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
There could be leakage of air from system due to wrong setting of :-
Correct Answer
Safety valve
Your Answer
Safety valve

Multiple Choice Single Answer
Question
The planned maintenance is carried out :-
Correct Answer
As per manufacturers recommendations
Your Answer
As per manufacturers recommendations

Select The Blank
Question
Time required to diagnose is about ________ percent to total down time.
Correct Answer
40-80
Your Answer
60-70

Select The Blank
Question
________ should be planned so that workers can approach the equipment easily.
Correct Answer
Gangways
Your Answer
Subways

Multiple Choice Single Answer
Question
Which activity is known as great helper for in avoiding unscheduled breakdowns?
Correct Answer
Inspection activity
Your Answer
Upgradation of System

Multiple Choice Multiple Answer
Question
Cost control can be achieved by :-
Correct Answer
Establishment of optimum conditions , Measurement of variation from optimum , Taking corrective action
Your Answer
Establishment of optimum conditions , Measurement of variation from optimum , Taking corrective action

True/False
Question
Spare parts are also stored to cater to emergency events like strike of transporters, strike at the supplier workshop, flood, Heavy rain etc.
Correct Answer
True
Your Answer
True

True/False
Question
Chart when prepared uses ' half split' method of fault diagnosis.
Correct Answer
True
Your Answer
False

Multiple Choice Multiple Answer
Question
Which are probable period of annual shut Downs in the Year?
Correct Answer
Demand for a product is Low , Festival Seasons , Supply of Raw material is nil.
Your Answer
Demand for a product is High , Festival Seasons , Supply of Raw material is nil.

Select The Blank
Question
Maintenance department's ________ shows low performance.
Correct Answer
High cost
Your Answer
High cost

Multiple Choice Multiple Answer
Question
Fire can be extinguished by?
Correct Answer
Taking away heat , Stopping oxygen , Chemical extinguishing
Your Answer
Taking away heat , Stopping oxygen , Chemical extinguishing

Multiple Choice Single Answer
Question
As the frequency of maintenance is stepped up preventive maintenance cost :-
Correct Answer
Shoots up
Your Answer
Shoots up

True/False
Question
It is said that budgetary process is more a test of implementation skill then anything else.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer
Question
Maintenance Control system is used to check following?
Correct Answer
Maintenance planning , To get correct feedback , Correct starting time of Maintenance activities
Your Answer
Correct starting time of Maintenance activities , Maintenance planning , To get correct feedback

True/False
Question
Some equipments are patented so manufacturing of spares is possible.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer
Question
Where CPM can be used?
Correct Answer
In Construction Business , In Research & Development Projects , Launching new products in Marketing
Your Answer
In Construction Business , In Research & Development Projects , Launching new products in Marketing

Multiple Choice Single Answer
Question
Which factor affects the safety of plant & people working in & around it?
Correct Answer
Accident
Your Answer
Accident

Multiple Choice Single Answer
Question
What is the requirement of effective & timely maintenance?
Correct Answer
Organizational Support
Your Answer
Organizational Support

Multiple Choice Multiple Answer
Question
First aid can be given in following accidents :-
Correct Answer
Steam burns , Chemical spilling
Your Answer
Steam burns , Chemical spilling , Cold Burning

Multiple Choice Multiple Answer
Question
High quality of workmanship helps maintenance people :-
Correct Answer
For boosting Morale of Maintenance People , In Identification of efficient workers , Rewarding Efficient Workers
Your Answer
To do Maintenance Planning , For boosting Morale of Maintenance People , Rewarding Efficient Workers

Multiple Choice Single Answer
Question
Negotiation of the price also includes :-
Correct Answer
Variation of the price
Your Answer
Exchange rates

Multiple Choice Multiple Answer
Question
Following equipment must be tested for correct load bearing capacity :-
Correct Answer
Scaffolding , Ladder , Platform
Your Answer
Ladder , Platform , Security gate

Multiple Choice Single Answer
Question
Generally insurance spare parts are purchased :-
Correct Answer
Along with original equipment
Your Answer
Along with original equipment

Multiple Choice Single Answer
Question
In any organization generally called thankless department is :-
Correct Answer
Maintenance
Your Answer
Maintenance

Multiple Choice Multiple Answer
Question
Which of the following are diagnostic instruments normally used in maintenance engineering?
Correct Answer
Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter
Your Answer
Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter

True/False
Question
Use of fine water spray is very wrong way of fire extinguishing.
Correct Answer
False
Your Answer
False

Select The Blank
Question
In the Start up of plant phase, plant is subjected to ________ where water being used in place of process fluid.
Correct Answer
Water trial
Your Answer
Leak trial

Multiple Choice Single Answer
Question
How steam act as cooling agent to extinguishing fire?
Correct Answer
Absorbs heat from fire
Your Answer
Create a Foam

Select The Blank
Question
The efforts are made to reduce time/effort required in carrying out maintenance work is ________.
Correct Answer
Design-in-maintenance
Your Answer
Maintenance

Select The Blank
Question
Reliability can be expressed as probability between________.
Correct Answer
0 to 1
Your Answer
0 to 1

Select The Blank
Question
It is estimated that during first year the maintenance cost may approximately about ________ more than the normal cost during subsequent years.
Correct Answer
0.2
Your Answer
0.2

True/False
Question
Calibration is an important function of maintenance manager.
Correct Answer
True
Your Answer
True

Select The Blank
Question
The ________ is done to check performance efficiency of a plant.
Correct Answer
Technological Review
Your Answer
Control Quality

True/False
Question
The operating cost of the equipment is also important factor for the decision making.
Correct Answer
True
Your Answer
True

Match The Following
Question
Correct Answer
Your Answer
Maintenance schedule
Schedule of over
Schedule of over
Technical data
Drawings
Drawings
Technical specification
Technical description
Technical description
Handling Instruction
Transportation
Movement data

Match The Following
Question
Correct Answer
Your Answer
Factory building
Cross ventilation
Proper Insulation
Foreign origin equipment
Manual translation into English
Better performance/reliability
Non standard spare parts
Maximum lead time
Installation too costly
Steam piping
Proper Insulation
Cross ventilation

True/False
Question
The budgetary control is planned to assist the management in the allocation of responsibility and authority to aid in making estimates and plans for the future.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
To avoid accidents & to have proper staff training, supplier must ensure that :-
Correct Answer
Complete technical help is supplied in writing to the plant engineers.
Your Answer
Complete technical help is supplied in writing to the plant engineers.

Multiple Choice Multiple Answer
Question
Which of the following are metal working oils?
Correct Answer
Soluble cutting oil , Synthetic cutting oil , Srip grinding oil
Your Answer
Soluble cutting oil , Synthetic cutting oil , Srip grinding oil
Bookmark and Share